Alupar launched power transmission system in MT

Posted in: 11/23/2011

Alupar launched power transmission system in MT

On 11/23/2011, the Transmissora Matogrossense de Energia, which includes the transmission line Jaurú-Cuiabá, with 348 km lenght, and the substations Jaurú (500/230 kV) and Cuiabá (500 kV), started commercial operation.

With the operation entry of this new venture, Alupar now owns 14 electricity transmission systems, totaling 4,515 km of transmission lines in operation, and has four other transmission systems under construction, expected to start operations in 2011, 2012 and 2015.